---
name: focus-block-plan-helper
description: "Fits focus sprints and breaks between your start and end of day, with an optional long break and a total of true focused time you can check. Use when focus sprints and breaks must fit exactly between a workday start and end time, with an optional long break. Do not use for assigning a task list to blocks or planning meetings. Related topics: productivity, work, focus."
---

# Focus Block Plan Helper

Fits focus sprints and breaks between your start and end of day, with an optional long break and a total of true focused time you can check.

## When to use

Use this skill when focus sprints and breaks must fit exactly between a workday start and end time, with an optional long break. Do not use it for assigning a task list to blocks or planning meetings.

## Workflow

1. Ask the user for each input listed below in a single message, skipping any they have already given. Where options are listed, offer them, but accept other answers too.
2. Add up the chosen blocks and breaks and compare the total with the time between start and end.
3. Shorten breaks first and blocks second if the total does not fit, noting each change.
4. Place the long break near the middle of the day when requested.
5. Label every block with a task category and keep the last 15 minutes for wrap-up.
6. Sort the table chronologically in HH:MM and state the total focused minutes.

## Inputs

- **Workday start time** (free text, e.g. "HH:MM")
- **Workday end time** (free text, e.g. "HH:MM")
- **Number of focus blocks** (number from 1 to 6)
- **Length of each focus block in minutes** (number from 25 to 120)
- **Length of each break in minutes** (number from 5 to 30)
- **Preferred task categories** (choose any: Writing, Coding, Research, Planning, Meetings)
- **Include a long break** (choose one: Yes, No)

## Output

A chronological markdown table with Time, Activity, Duration, and optional Note columns in HH:MM, then one plain-text line with total focused minutes.

## Prompt template

Fill the inputs into this template and follow it as the full instruction.

### Focus Sprints Between Start and End of Day

Divide my workday into focus sprints and breaks that fit exactly between two times.

- Workday start time: {{Workday start time}}
- Workday end time: {{Workday end time}}
- Number of focus blocks: {{Number of focus blocks}}
- Length of each focus block in minutes: {{Length of each focus block in minutes}}
- Length of each break in minutes: {{Length of each break in minutes}}
- Preferred task categories: {{Preferred task categories}}
- Include a long break: {{Include a long break}}

Work out whether the chosen blocks and breaks fit inside the workday. If they do not, shorten the breaks first, then the blocks, and say what changed. When a long break is on, place it near the middle of the day, around 30 to 45 minutes. Label each block with a task category from the chosen list. Keep office hours realistic by leaving the last 15 minutes for wrap-up.

Return a markdown table sorted by time with the columns Time, Activity, Duration, and an optional Note, using HH:MM for start and end times. Close with a plain-text line giving the total focused minutes.

## Pitfalls

- Producing a table that ends after the stated workday end because the fit was never checked.
- Counting breaks and the wrap-up as focused time in the final total.
- Putting the long break at the very start or end, where it recovers nothing.
