name: home-renovation-budget-planner
description: "Turns a renovation scope into a budget by trade with ranges, the hidden costs people forget, a contingency sized to the building and a build sequence. Use when a homeowner is planning a renovation and needs a realistic budget range by trade, including hidden costs and a contingency. Do not use for a mortgage or financing comparison, or a finished-room design. Related topics: Home, Finance, Planning."
---

# Home Renovation Budget Planner

Turns a renovation scope into a budget by trade with ranges, the hidden costs people forget, a contingency sized to the building and a build sequence.

## When to use

Use this skill when a homeowner is planning a renovation and needs a realistic budget range by trade, including hidden costs and a contingency. Do not use it for a mortgage or financing comparison, or a finished-room design.

## Workflow

1. Ask the user for each input listed below in a single message, skipping any they have already given. Where options are listed, offer them, but accept other answers too.
2. Break the scope into trades and price each as a low to high range.
3. Add the hidden lines: skips, permits, storage, temporary accommodation, living costs and making good.
4. Set the contingency percentage against the property age and known issues, and justify it.
5. Adjust for the jobs the household will do itself, noting the saving and the risk.
6. Order the work so no task is repeated and list the elements most likely to overrun.

## Inputs

- **What is being done, room by room** (longer free text)
- **Structural work involved** (longer free text)
- **What is replaced versus repaired** (longer free text)
- **Age, type and known issues** (longer free text)
- **Listing or conservation constraints** (choose one: Yes, No)
- **Budget** (free text, e.g. "What you have and whether there is any give")
- **What you would do yourself** (longer free text)
- **Timeline** (longer free text)
- **Living there during the work** (choose one: Staying throughout, Moving out, Partly, Not decided)

## Output

A budget table by trade with low and high figures, a separate hidden-costs table, the contingency with its reasoning, a work sequence, and a short list of likely overruns.

## Prompt template

Fill the inputs into this template and follow it as the full instruction.

### Renovation budget

**The job**
- What is being done, room by room: {{What is being done, room by room}}
- Structural work involved: {{Structural work involved}}
- What is replaced versus repaired: {{What is replaced versus repaired}}

**The property**
- Age, type and known issues: {{Age, type and known issues}}
- Listing or conservation constraints: {{Listing or conservation constraints}}

**The household**
- Budget: {{Budget}}
- What you would do yourself: {{What you would do yourself}}
- Timeline: {{Timeline}}
- Living there during the work: {{Living there during the work}}

Break the cost down by trade and material, giving a range rather than a single number. Then add the lines people leave out: skips, permits, storage, temporary accommodation, eating out for weeks, and making good afterwards.

Set the contingency against the age of the property, since older buildings hide more behind the plaster. Sequence the work so nothing is done twice, such as first-fix services before plastering. Subtract any jobs the household will do itself and say what that saves and risks.

Finish by naming which elements most often overrun and where spending more pays versus where it simply disappears.

## Pitfalls

- Quoting single-figure prices for a job where the scope is uncertain.
- Setting a flat 10 percent contingency regardless of the property's age and condition.
- Forgetting the cost of living elsewhere or eating out during the work, which is often a large sum.