---
name: stain-removal-scheduler
description: "Spreads a stubborn stain treatment across several days with a dated table of what to apply, when and why, so the work finishes by your deadline. Use when a stain needs repeated treatment over days and the person wants a dated plan that ends by a deadline. Do not use for a single-session removal guide or diagnosing the stain. Related topics: home, gardening, Stain Removal."
---

# Stain Removal Scheduler

Spreads a stubborn stain treatment across several days with a dated table of what to apply, when and why, so the work finishes by your deadline.

## When to use

Use this skill when a stain needs repeated treatment over days and the person wants a dated plan that ends by a deadline. Do not use it for a single-session removal guide or diagnosing the stain.

## Workflow

1. Ask the user for each input listed below in a single message, skipping any they have already given. Where options are listed, offer them, but accept other answers too.
2. Count the days to the deadline and plan backwards so the final day is a check.
3. Put the gentlest treatment first and schedule rest or drying days between applications.
4. Compress the plan into fewer, stronger steps for high urgency, or spread gentle repeats for low urgency.
5. Add a check-the-result day for large areas or delicate surfaces before escalating.
6. Write one table row per day in date order with prep steps in the Notes column.

## Inputs

- **Stain type** (choose one: Grass, Wine, Oil, Mud, Ink, Other)
- **Affected surface** (choose one: Fabric, Carpet, Concrete, Wood, Stone, Plant leaf)
- **Area size** (choose one: Small (under 10 sq cm), Medium (10 to 30 sq cm), Large (over 30 sq cm))
- **Methods I will use** (choose any: Soak, Scrub, Spray, Natural remedy, Professional service)
- **Deadline date** (free text, e.g. "YYYY-MM-DD")
- **Urgency** (choose one: Low, High)
- **Products I have** (longer free text)

## Output

A markdown table with Date, Stain Type, Surface, Action, Product and Notes, one row per day in date order.

## Prompt template

Fill the inputs into this template and follow it as the full instruction.

### Multi-Day Stain Treatment Schedule

Schedule the treatment of a stain so it is gone by a set date.

- Stain type: {{Stain type}}
- Affected surface: {{Affected surface}}
- Area size: {{Area size}}
- Methods I will use: {{Methods I will use}}
- Deadline date: {{Deadline date}}
- Urgency: {{Urgency}}
- Products I have: {{Products I have}}

Count the days between today and the deadline and plan backwards from it. Put the gentlest treatment first and leave rest or drying days between applications so the surface can recover. High urgency compresses the plan into fewer, stronger steps; low urgency uses more gentle repeat treatments. If the area is Large or the surface is a plant leaf or stone, include a day to check the result before continuing. Mention when a professional service is the safer finish.

Return a markdown table with the columns Date, Stain Type, Surface, Action, Product, Notes. List one row per day in date order and put prep steps in Notes.

## Pitfalls

- Scheduling strong treatments on consecutive days with no recovery time for the surface.
- Using products the user did not list without saying so.
- Ignoring the deadline, so the plan runs past the date given.
