---
name: focus-block-plan-architect
description: "Calculates a sequential timetable of deep-work blocks from your start time, with transition buffers, break activities, and a warning when the plan overruns an eight-hour day. Use when deep-work blocks need exact start and end times from a given start time, including transition buffers and an overrun check. Do not use for task-by-task daily planning or a plan with fixed meetings. Related topics: productivity, work, focus."
---

# Focus Block Plan Architect

Calculates a sequential timetable of deep-work blocks from your start time, with transition buffers, break activities, and a warning when the plan overruns an eight-hour day.

## When to use

Use this skill when deep-work blocks need exact start and end times from a given start time, including transition buffers and an overrun check. Do not use it for task-by-task daily planning or a plan with fixed meetings.

## Workflow

1. Ask the user for each input listed below in a single message, skipping any they have already given. Where options are listed, offer them, but accept other answers too.
2. Compute each block's start and end sequentially from the start time using block length, break, and a 5 minute buffer.
3. Assign the task categories across the blocks and give the first block the stated priority.
4. Total the elapsed time and compare it with an eight hour day.
5. Flag any overrun and name the blocks to shorten or remove.
6. Write three tips for keeping to the timetable.

## Inputs

- **Workday start time** (free text, e.g. "HH:MM")
- **Number of focus blocks** (number from 1 to 8)
- **Length of each block in minutes** (number from 15 to 120)
- **Preferred break activity** (choose one: Stretch, Walk, Meditation, Coffee, Quick chat)
- **Task categories to allocate** (choose any: Writing, Coding, Research, Planning, Meetings)
- **Priority of the first block** (choose one: High, Medium, Low)

## Output

A markdown table with Block, Start Time, End Time, Task Category, and Break Activity, then three tips and an overrun note when the total exceeds eight hours.

## Prompt template

Fill the inputs into this template and follow it as the full instruction.

### Focus Block Timetable

Design a workday as a sequence of deep-work blocks with exact times.

- Workday start time: {{Workday start time}}
- Number of focus blocks: {{Number of focus blocks}}
- Length of each block in minutes: {{Length of each block in minutes}}
- Preferred break activity: {{Preferred break activity}}
- Task categories to allocate: {{Task categories to allocate}}
- Priority of the first block: {{Priority of the first block}}

Calculate every time sequentially from the start time: block length, then the break, plus a 5 minute transition buffer between blocks. Spread the chosen task categories across the blocks, giving the first block the stated priority. Add up the total elapsed time. If it passes a typical eight hour day, say so and suggest which blocks to shorten or drop instead of silently trimming them.

Return a markdown table with the columns Block, Start Time, End Time, Task Category, and Break Activity. Follow it with three concise tips for sticking to the plan.

## Pitfalls

- Forgetting the transition buffer, so every later start time is a few minutes too early.
- Silently cutting blocks to fit eight hours instead of telling the user the plan overruns.
- Putting meetings in a deep-work block, which defeats the purpose of the timetable.
